Was in the field this week north of Seattle and wanted to share some photos. We had progressively nice weather, but the rain left large puddled areas along our access roads and determining draining solutions was challenging.
A beautiful and chilly morning with some patchy fog.
[...]

Sunday, December 2, 2012

Wenatchee, Tehaleh, and Trial

Last week of November 2012. Matt was in trial and I was in the field. Only one of us was able to take pictures. These are my favorites.

Our work took us through an orchard.
[...]

Saturday, October 27, 2012

Two crazy weeks

Disclaimer: It's been a month of long hours outside, so I apologize for the rather dry dialog.... my brain is running on fumes. Also, I really wish I had taken more pictures in Anchorage, but I was having such a great time with all my friends, that it never crossed my mind!


While I was out working on the bridge (see previous post) I got a call about going to Alaska with Gabe! Really, that was all I needed to hear before I as nonchalantly as humanly possible said "Sure" while inside I was jumping up and down with excitement. This would be my first time back in state since 2010 when Matt and I went to Megan and Aaron's wedding. 

The job was up at Eielson AFB in the Interior about 30 min SE of Fairbanks. The project itself was simple enough- getting vertical and horizontal data on over 200 water quality monitoring wells. We worked with Chris from EA Engineering who was a huge help and the unofficial third person on the crew. I wish I could have taken more pictures, but the military frowns on that. We watched F16s all week. No matter how many times you see them screaming overhead it never gets old! [...]

Thursday, September 27, 2012

The Sellwood Bridge

Sorry, for the blur spot. It was bright and I couldn't see
the panorama correctly in my camera.
Today was my first day on the project site. I won't go into too much detail, but you can learn more about the project here. There's even a link to two live feed cameras. Currently, we have to help Advanced American Construction set 150 pylons by Oct. 15. Basically, I stand on the shore (currently) and tell them based on our instrument readings where they need to go to set the pylon in the correct spot. It sounds like "Go offshore/inshore 3 tenths and upriver/downriver 8 tenths." We aim for a 2 tenth tolerance, but it's up to them to decide when it's close enough. This process takes patience since our instruments are very accurate and a crane on a barge is not so much. Then they use a hydraulic hammer to pound it into the bedrock while we periodically stop and check to make sure we're still in the correct spot and haven't slid out of place. 

Ben took this of me on the east platform.
[...]

Friday, January 20, 2012

Keep calm and carry on.

Matt hit the ground running and started work the next morning after we arrived and I spent the next few days getting utilities set up, checking on the cats, and running errands. This is the first time EVER that every utility is in my name (he's authorized on the accounts of course). Despite having to say "no, i don't have a job" to every person trying to set up accounts, my credit score is awesome enough to avoid deposits. Yeah! Moving in day was Sunday morning. Ed, Fender, and Mackenzie came to lend a hand and they did an awesome job. Thanks guys! 



[...]